The Jonsson Project

Now the gunite is being shot. (Gunite:a mixture of cement and sand and water that is sprayed on a surface under pneumatic pressure) This is a process that takes about 4 hours for a pool, and 4-5 hours for a pool & spa combo. Here, the nozzle guy will create the steps and benches.
The next phase is the Tile and Coping. And if we are building a waterfall, this is the phase we fabricate it. The Jonsson's have picked a beautiful tile that matches the color of the exterior of their home as well as the natural landscaping. Once all the tiles and stones are in place, we will start the deck work. The Jonsson's have chosen to go with a salt finish concrete(last pic is what it looks like).
As the deck is setting, check back with us to see the next phase!!